Outline of the Shared Facility Use System
Shared Use of Facilities Including Joyo
Use Fees for Shared Facilities Including Joyo
About Use Fees
Application Form for Use of Joyo and the PIE Facilities
Schematic Flow Diagram of Use for Irradiation (An Example of Material Irradiation)
Outline of Joyo
Performance of the Joyo MK-III Core
Irradiation Rigs
Post Irradiation Examination Facilities
Access Map・Contacts
Site Map
 
 

The Use Fee for Joyo and the PIE Facilities

 

Use Fee for Joyo

The “cost of facility operation” for Joyo is calculated as the “irradiation costs.”
The irradiation costs are calculated as follows:
(Unit price of irradiation cost) × (Total neutron fluence) × (Volume of capsules, etc.)

An example of the “additional costs” for use of Joyo
・Manufacturing costs of irradiation rigs
When using a part of the rig, the cost for volume use is charged.
・Manufacturing cost of capsules, etc.

An example of the “waste costs” for Joyo use
・Liquid waste from cleaning the irradiation rigs, etc.
 

Use Fees for the PIE Facilities

The “cost of facility operation” for the PIE facilities (FMF, AGF and MMF) is calculated as the “PIE cost.”
The PIE cost is calculated as follows:
(Use fee per one hour for each PIE item) × (Hours used)

An example of the “additional costs” for use of the PIE facilities
・Jigs / Tools for test equipment
・Consumables for testing, etc.

An example of the “waste costs” for use of the PIE facilities
・Samples already tested
・Irradiation capsule, etc.
 
 
 
 