2010 | |
July 28th | Specialist Meeting on Under Sodium Viewing System of SFR |
March 17th-18th | Second Specialist Meeting on In-vessel Inspection and Repair of FBR. |
2009 | |
March 19th | Renewal of containment vessel air ventilation system was carried out |
2008 | |
December 9th | Specialist Meeting on In-vessel Inspection and Repair of FBR. |
April 15th | Science and technology award. |
January 15 - February 7 | Inspection of the fuel handling equipment was carried out. |
2007 | |
December 5th | Withdrawal of Upper Core Structure Irradiation Plug Rig was carried out. |
June 6th | Celebration of the 30th anniversary of Joyo. |
May 15th | Started the 15th annual inspection. |
May 8th-14th | The MK-III 6' special cycle was carried out as a short term irradiation test of Minor Actinide (MA) doped MOX fuel. |
April 24th | Tree planting for the 30th anniversary of Joyo's initial criticality. |
April 12th | Completion of the MK-III core 6 duty cycle operation. |
March 12th | At 17:41, accumulated operation time of Joyo reached 70,000 hours from the first criticality on April 24th, 1977 |
March 7th | Started up the reactor for the MK-III core 6 duty cycle. |
February 2nd | Completion of the MK-III core 5 duty cycle operation. |
2006 | |
December 27th-29th | Automatic reactor shutdown due to loss of off-site power caused by lightning strikes. Restarted the reactor on the 27th of December, and reached rated power on the 29th of December. |
December 11th | Started up the reactor for the MK-III core 5 duty cycle. |
November 17th | Completion of the MK-III core 4 duty cycle operation. |
November 15th | On November 14th(local time 12:00), 2006, Joyo’s receipt of the "Nuclear Historic Landmark Award" was announced at the American Nuclear Society (ANS) 2006 winter meeting. |
September 16th | Started up the reactor for the MK-III core 4 duty cycle. |
August 21th-24th | The MK-III 3-2' special cycle was carried out as a short term irradiation test (irradiation time : 24 hours) of Minor Actinide (MA) doped MOX fuel. |
July 28th | Completion of the MK-III core 3-2 duty cycle operation. |
July 15th-17th | Automatic reactor shutdown due to loss of off-site power caused by lightning strikes. Restarted the reactor on th e16th of July, and reached rated power on the 17th of July |
June 6th | Started up the reactor for the MK-III core 3-2 duty cycle. |
May 24th-26th | The MK-III 3-1' special cycle was carried out as a short term irradiation test (irradiation time: 10min) of Minor Actinide (MA) doped MOX fuel. |
May 15th | Completion of the 14th annual inspection. |
May 10th | Completion of the MK-III core 3-1 duty cycle operation. |
April 27th | Started the in-pile creep rupture test of the cladding materials using Material testing Rig with Temperature Control -2 (MARICO-2). |
April 27th | Started up the reactor for the MK-III core 3-1 duty cycle. |
March 31st | Completion of concrete cooling system heat exchanger tube replacement under way since October 17th, 2005. |
2005 | |
July 11th- August 22th | Installation of the Material Testing Rig with Temperature Control -2 (MARICO-2) |
June 3rd: | JNC signed a contract with the Pacific Northwest National Laboratory (PNNL) for the fabrication of components for irradiation rigs which could be used for materials testing in Joyo. |
April 28th - May 13th | Withdrawal of the Self-Actuated Shutdown System (SASS) lower guide tube was carried out. |
March 29th | Joyo received the 37th AESJ award for its "Irradiation capability upgrading program for the experimental fast reactor Joyo MK-III project" by Atomic Energy Society of Japan. |
January 11th - April 7th | Inspection of the fuel handling equipment was carried out. |
2004 | |
December 13th - February 25th, 2005 | Overhaul of the rotating plug was carried out. |
November 26th | Started the 14th annual inspection. |
November 15th-17th | The MK-III core 2' special cycle was carried out as part of the fuel failure simulation test. |
November 11th-29th | Fuel failure simulation test was carried out. |
October 23rd | Completion of the MK-III core 2nd duty cycle operation. |
August 23rd | Started up the reactor for the MK-III core 2nd duty cycle. |
July 27th | Completion of the MK-III core 1st duty cycle operation. |
June 2nd | Started SASS stability test. |
May 31st- June 1st | Characteristic tests of SASS electromagnet at the beginning of 1st duty cycle |
May 24th | Started up the reactor for the MK-III core 1st duty cycle. |
April 30th | PX-Joyo technical information exchange meeting. |
March 8th | Installation of the Self-Actuated Shutdown System(SASS) |
January 26th | Symposium on the Joyo MK-III upgrading to achieve 140MWt. |