The status of dismantling and removal work for inside the containment vessel is as follows. Lower header after Lower header before Main steam pipe after Main steam pipe before Recirculation pump manifold after Recirculation pump manifold before Core outlet rizer pipe after Core outlet rizer pipe before Core inlet feeder pipe after Core inlet feeder pipe before Instrument rack etc. after Instrument rack etc. before
Return to About decommissioning